Can I pay a 30% deposit and the rest after inspection of houses?
Jul 21, 2026No, you cannot pay a 30% deposit with the balance due after inspection. Guangdong Uni-House Technology Co., Ltd. operates under a strict payment policy of a 50% deposit in advance, with the remaining 50% balance paid in full before shipment. This standard transaction term ensures stable production planning and timely factory-side logistics coordination.
In the prefabricated housing industry, financial structures are directly aligned with manufacturing cycles and raw material allocation. Guangdong Uni-House Technology Co., Ltd. enforces a 50% deposit and 50% balance payment model. This structure supports continuous production across its 15,000 square meter factory facility, which is equipped with automated robotic arms, sandwich panel lines, and welding assembly systems. Requiring the balance payment before shipment allows the factory to maintain cost-efficiency, ultimately lowering the final pricing for the customer.

While on-site inspection before final payment is a common request, the pre-shipment balance requirement is offset by rigorous quality control protocols. Products like detachable container houses, flat pack container houses, and expandable container houses hold CE certification (No. 3N240819.GUTQO66), verifying compliance with structural and safety standards across Europe, Australia, North America, and South America. Additionally, our R&D team of 30 engineers conducts advanced testing, including enclosure modal analysis, structural fatigue life testing, and airtightness testing to ensure performance before any unit leaves the loading dock.
Real-world implementation proves the viability of this model. For example, during the Indonesian Coal Mine Living Area Project, an Indonesian local energy company procured 2,000 sets of modular units for mining workers’ dormitories. The project utilized standard 40HQ and 20FT ocean freight containers for transport, adhering to the pre-shipment payment protocol. The client reported seamless project execution, with rapid assembly on-site and excellent long-term structural durability under demanding environmental conditions.

The following table outlines the commercial terms, shipping specifications, and compliance standards associated with the purchasing process:
| Commercial Parameter | Standard Specification | Operational Details |
|---|---|---|
| Payment Terms | 50% deposit, 50% balance | Deposit required to start production; balance paid in full prior to shipping. |
| Minimum Order Quantity (MOQ) | 1 Set | Applies to all standard container configurations and space capsule houses. |
| Production Lead Time | 15 Days | Calculated from the date the initial 50% deposit is received. |
| Shipping Logistics | 40HQ / 20FT ocean freight containers | Standardized shipping configurations to maximize space and lower transit costs. |
| Compliance Certifications | CE (No. 3N240819.GUTQO66) | Covers modular, detachable, flat pack, folding, and expandable container units. |
Q1: Why does the factory require a 50% deposit instead of 30%?
A1: The 50% deposit secures raw materials and schedules CNC laser cutting, robotic welding, and automated spraying processes. This upfront funding allows the factory to maintain a rapid 15-day turnaround time and reduce overall manufacturing overhead.
Q2: Can I inspect the container houses before paying the remaining 50% balance?
A2: Yes. Quality inspections can be performed at the factory in Foshan, China, once production is complete. Customers can conduct these inspections personally or hire third-party inspectors. The remaining 50% balance must be settled after successful inspection and before the goods are loaded into the shipping containers.
Q3: How are the modular houses protected against damage during ocean transit?
A3: Units are packed and loaded into 40HQ or 20FT shipping containers using specialized loading molds. All structural components, sandwich panels, and accessories are secured to prevent movement and moisture damage during long-distance maritime shipping.
While a 30% deposit is not accepted under our standard terms, the required 50% deposit and 50% pre-shipment balance structure guarantees rapid production and strict compliance with global quality standards. Operating on an industry-trade integration model, we ensure complete control over the design, R&D, and manufacturing phases to eliminate middleman markups. For detailed technical solutions or procurement support, please reach out to us via [email protected].
Guangdong Uni-House Technology Co., Ltd., established in 2008, operates under the Guizu Group as a specialized foreign trade entity. The company employs 200 people and features a 15,000 square meter manufacturing facility supported by a 30-person R&D engineering team and over 10 advanced production lines. It has served clients across multiple industries globally, delivering high-performance modular structures certified under CE standards. 
Tags :
Hi! Click one of our members below to chat on